M204.0518
M204.0518 Can't initialize 3275 subtask
Model 204 uses internal or pseudo subtasks (PST) to perform certain asynchronous tasks. One PST is required for every IODEV 19
line group defined in the CCAIN parameters. All PSTs were allocated before all of the IODEV 19
statements were processed. The Online run is terminated.
System manager response: Determine the actual number of pseudo subtasks needed in the Model 204 Online run, replace the value of the NSUBTKS parameter with the new value, and rerun the job.
Operator response: Notify the system manager.